Official company website Orbit Energy SRL · Brussels · BCE 0475.369.779 · VAT BE0475369779 · Est. 2001
Orbit Energy Orbit EnergyBelgian engineering SRL

Selected work

Named plants, clear mandates, photography from the field.

International advisory sits beside Iraq execution records from the company register. Each photograph appears once; new site sets are added as they are received.

20Named assignments
4Countries
46Unique site photos
2001Belgian SRL since

Project register

Iraq execution and international advisory.

Iraq execution

Iraq27 Jul 2021

Boiler wall replacement — Unit 4

تبديل جدران المرجل للوحدة التوليدية الرابعة

Al-Musayyib Thermal Power Plant

Contract 50Boiler works
Iraq24 Nov 2021

Boiler wall replacement — Unit 2

تبديل جدران المرجل للوحدة التوليدية الثانية

Al-Musayyib Thermal Power Plant

Contract 89Boiler works
Iraq11 Jan 2022

400 kV transmission towers — Missan–Kut

تنفيذ وتجهيز اعمال مشروع أبراج كهربائية / مقاول ثانوي

Missan–Kut 400 kV line · General Company for South Transmission

SubcontractorTransmission
Iraq24 Jul 2022

Self-cleaning air filters for gas units

تصميم وتنصيب منظومة التنظيف الذاتي لفلاتر الهواء للوحدات الغازية

Al-Musayyib Gas Power Plant

Contract 46Design & installation
Iraq29 Sep 2022

Rotary air heater rehabilitation — Unit 4

تأهيل مسخنات الهواء الدوارة للوحدة التوليدية الرابعة

Al-Musayyib Thermal Power Plant

Contract 123Air heaters
Iraq29 Sep 2022

Rotary air heater baskets supply

تجهيز سلال مسخنات الهواء الدوارة

Al-Musayyib Thermal Power Plant

Contract 124Supply
Iraq29 Sep 2022

132 kV towers — South Nasiriyah / Basiyah

تنفيذ وتجهيز اعمال مشروع أبراج كهربائية / مقاول ثانوي

South Nasiriyah – Basiyah · General Company for South Transmission 132 kV

Contract 372Subcontractor
Iraq12 Nov 2024

Boiler wall replacement — Unit 1

تبديل جدران المرجل للوحدة التوليدية الأولى

Al-Musayyib Thermal Power Plant

Contract 80Boiler works
Iraq12 Jul 2025

Dismantling generating units 3 and 4

تفكيك الوحدات التوليدية الثالثة والرابعة

Al-Dora Thermal Power Plant

Plant dismantling
Iraq9 Dec 2025

Rotary air heater repair — Unit 2

تصليح مسخنات الهواء الدوارة للوحدة التوليدية الثانية

Al-Musayyib Thermal Power Plant

Contract 113Air heaters
IraqAdvisory

Diwaniyah 4 × 125 MW GE Frame 9E, HFO upgrade

Construction supervision for the heavy-fuel conversion of the GE Frame 9E units.

Construction supervision
IraqAdvisory

Mussaib 1,600 MW — 4 × Siemens STG rehabilitation

Construction supervision on the steam-turbine rehabilitation programme.

Construction supervision

International advisory

HondurasSupervision

Boiler rehabilitation, 602 MW HFO plant

Construction supervision on the heavy-fuel boiler rehabilitation.

Construction supervision
HondurasInspection

Boiler inspection, 380 MW steam turbine

Condition survey of the boiler and steam-turbine asset.

Asset inspection
HondurasRelocation

60 MW Wärtsilä, Las Palmas → Puerto Cortés

Relocation advisory for the Las Palmas Wärtsilä plant.

Relocation advisory
HondurasIndependent engineer

Boiler EPC, 87.5 MW, La Ceiba

Independent engineer on the La Ceiba boiler EPC.

Independent engineer
HondurasRelocation

160 MW Wärtsilä, Arizona → Puerto Cortés

Relocation advisory for the Arizona Wärtsilä plant.

Relocation advisory
NorwayManagement

175 MW Pratt & Whitney plant, Tjeldbergodden

Project management for the P&W generation asset.

Project management
NorwayInspection

180 MW Pratt & Whitney plant, Nyhamna

Asset inspection of the Nyhamna P&W plant.

Asset inspection
TurkeyAdvisory

210 MW combined cycle, Mardin

Project advisory on the Mardin combined-cycle plant.

Field photography

Work on the ground.

01 / 46

Next sets Photography continues.

New project photos are placed here as you send them. Images already on the site are not repeated.

Next assignment

Send the next photo set or the next plant.

Additional project photography is added without repeating images already in the gallery. The register grows with each contract you send.

Start a project
Orbit Energy project photograph